Nhà Thép Khang Thịnh logo

RADIAL GATE – DAI BINH HYDROPOWER DAM

Supply and installation of radial (spillway) gates for Dai Binh Hydropower Dam – a critical hydraulic structure enabling water flow regulation. The gates were fabricated using high-strength structural steel to ensure long-term durability and safe operation under hydropower conditions.

RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM
RADIAL GATE – DAI BINH HYDROPOWER DAM

Status

Completed

Categories

Industrial Buildings
  • CLIENT INDUSTRY: Energy – Hydropower

  • LOCATION: Bao Loc City, Lam Dong Province, Vietnam

  • CONSTRUCTION YEAR: 2019–2021

Related projects